2000

Torino-Orbassano Intermodal Freight Terminal | Turin (Italy)

Torino-Orbassano Intermodal Freight Terminal. Turin (Italy) Customer S.I.TO. S.p.A. Prestazioni svolte Masterplan and Feasibility study General layout and urban planning of the whole intervention Preliminary and Final Design (Infrastructure, roads networks, Buildings, etc.) Project cost ...

Waste Water Treatment Plant | Bolzano (Italy)

Reconstruction and modernization of the mud dehydration section at the Waste Water Treatment Plant of Bolzano (Italy) Customer ECO-CENTER S.p.A. Prestazioni svolte Preliminary and Final Design Project cost Euro 2,3 mln of works Years 1998 ...

“Campo di Marte” Hospital | Lucca (Italy)

“Campo di Marte” Hospital:  new section for AIDS treatment (with rooms and laboratories). Lucca (Italy) Customer U.S.L. n. 2 of Lucca Activities Preliminary and Final Design (Architecture, Structural and MEP Engineering) Site Supervision, Quantity Survey Project ...

“Icarus” Alenia Spazio Center | Turin (Italy)

“Icarus” Alenia Spazio Center, International Space Station modules assembly laboratories in Turin (Italy) Customer Icarus S.p.A. Activities Preliminary and Final Design Site Supervision Project cost Euro 12,3 mln of works Years 1998 – 2001

Waste Water Treatment Plant | Oulx and Sauze d’Oulx (Turin, Italy)

Sewerage system and Waste Water Treatment Plant in Oulx and Sauze d’Oulx municipalities. Turin (Italy) Customer Oulx and Sauce d’Oulx municipalities Activities Final Design Site Supervision Control of worker’s safety on site Project cost Euro ...

Turin-Ceres railway: Caselle underground passage | Turin (Italy)

Turin-Ceres railway: Caselle urban area underground passage with station. Turin (Italy) Customer S.A.T.T.I. S.p.A. Prestazioni svolte Preliminary and Final Design Environmental Studies Site Supervision, Quantity Survey Control of worker’s safety on site Project cost Euro 24,0 ...

Florence-Pisa railway line, Alternative route Signa-Montelupo

Civil works of the Arno viaduct. Alternative route of Signa-Montelupo on the Florence-Pisa railway line.  (Florence, Italy) Customer Italferr S.p.A Prestazioni svolte Preliminary and Final Design (Architecture, Geotechnical, Structural and MEP Engineering) Control of worker’s ...

New Turin-Lyon High Speed Railway Line. Carrière du Paradis

New Turin-Lyon High Speed Railway Line. Environmental analysis of marine storage at Carrière du Paradis, Mont Cenis pass (France) Customer Alpetunnel GEIE Prestazioni svolte Environmental analysis for the recovery of the abandoned quarry Mode and ...

New Turin-Lyon High Speed Railway Line. Environmental recovery

New Turin-Lyon High Speed Railway Line. Environmental recovery of S. Ambrogio di Susa abbandoned quarry. Turin (Italy) Customer Alpetunnel GEIE Activities Environmental and Landscape analysis Recovery proposal with the marine storage and Landscape verifcation Project ...

Doubling Orte-Falconara Railway Line

Doubling and extension of the Orte-Falconara Railway Line between Castelplanio and Montecarotto. Ancona (Italy) Customer Italferr S.p.A. Activites Environmental studies concerning the Final Design (Acoustics, Landscape, Archeological Report) Re-examination of the Preliminary Design Final Design ...