2008

New Municipal Stadium | Siena (Italy)

New Municipal Stadium in Borgo Vecchio locality, Siena (Italy) Customer Municipality of Siena Activities International architecture contest (winner proposal) Preliminary and Final Design (Environmental aspects, Environmental Impact Assessment) Project cost Euro 60,0 mln of works ...

O Sole Mio | Abu Dhabi (United Arab Emirates)

“O Sole Mio”prototype of Green Building (United Arab Emirates) Activities Preliminary concept design Project cost Euro 100.0 mln Years 2008

Parco Dora in area “Spina 3 – Vitali” | Turin (Italy)

“150th anniversary of Italy’s Unification”: New Parco Dora in area “Spina 3 – Vitali”. Turin (Italy) Customer Municipality of Turin Activities Project & Construction Management Final Design (Architecture, Structural, MEP Engineering, Hydraulics and Landscape) Project ...

“Rivarolo Urban Center” | Rivarolo Canavese (Turin, Italy)

“Rivarolo Urban Center” : mutipurpose center with hotel, offices and shopping mall in Rivarolo Canavese (Turin, Italy) Customer Private Investor Activities Urban Planning Preliminary and Final Design (Architecture, Structural and MEP Engineering, Infrastructure) Site Supervision ...

High-voltage power line Trino Vercellese – Lacchiarella

High-voltage power line Trino Vercellese – Lacchiarella (90km of line) – Italy Customer Terna S.p.A. (Italian Electrical Network Co.) Activities Region-level environmental impact assessment procedure Years 2007 – 2008

Conversion of industrial building | Aosta (Italy)

Conversion of industrial building into a warehouses within the Industrial Park “Espace Aosta” (Aosta, Italy) Customer Valle D’Aosta Structure S.r.l. Activities Preliminary and Final Design (Structural and MEP Engineering) Control of worker’s safety on site ...

Intermodal crossborder logistics platform Gorizia – Nova Gorica (Ita – Slo)

Intermodal crossborder logistics platform and Gorizia -Nova Gorica Special Zone (Italy – Slovenja) Customer Province of Gorizia Activities Feasibility study (Technical, environmental, economic and financial conditions) Administration Assistance to promote agreements Delphy survey with sublects ...

High-voltage power line Dolo-Camin Fusina-Malcontenta

High-voltage power line Dolo-Camin Fusina-Malcontenta Customer Terna S.p.A. Prestazioni svolte Environmental Impact Assessment Years 2007 – 2008

International Film Festival Center | Venice (Italy)

International Film Festival Center in Venice (Italy) Customer Municipality of Venice Activities Design for Tender works (Environment, MEP Engineering, Foundations Engineering) Project cost Euro 78,0 mln of works Years 2006 – 2007 Architecture by 5+1AA ...

Waste Water Treatment Plant | Ivrea (Turin, Italy)

Waste Water Treatment Plant: Improvement and conformity to legal requirements (33.000 equivalent inhabitants) of Ivrea (Turin, Italy) Customer SMAT S.p.A. (Turin Water Company) Activities Final Design Site Supervision, Quantity Survey Control of worker’s safety on site Project cost Euro 6.2 ...