Chronology

Wind Energy Plant | Garessio (Cuneo, Italy)

Wind Energy Plant in Garessio (Cuneo, Italy) Customer San Bernardo Wind Energy S.r.l. Activities Environmental Impact Assessment – Aprrovate by the Cuneo Province Datas a) 7 wind turbines for a power of 10,5 MW (completed) ...

Buddhist Italian Centre | Corsico (Milan, Italy)

Buddhist Italian Centre | Corsico (Milan, Italy) Customer Istituto Buddista Italiano Soka Gakkai (IBISG) Activities Preliminary and Final Design (Structural and MEP Engineering) Control of worker’s safety on site Site Supervision Emergency planning of the ...

“Macchiorlatti” residential buildings | Borgaro T.se (Turin, Italy)

Conversion of the “Macchiorlatti” former steel-plant area into residential bildings. Borgaro T.se (Turin, Italy) Customer Private Investor Activities Urban Planning Preliminary and Final Design Site Supervision Control of worker’s safety on site Datas 50.000 sqm area ...

“Senyo” Design Hotel | Accra (Ghana)

“Senyo” 5 stars Design Hotel in Accra (Ghana) Customer Contact and Supply Services, Accra (Ghana) Activities Final Design (Structural Engineering) Final Design (MEP Engineering – technical specification BMS System) Project cost Euro 16,0 mln of works ...

Waste Water Treatment Plant | Pinerolo (Turin, Italy)

Waste Water Treatment Plant: Improvement and conformity to legal requirements (100.000 equivalent inhabitants) | Pinerolo (Turin, Italy) Customer SMAT S.p.A. (Turin Water Company) Activities Preliminary and Final Design Site Supervision, Quantity Survey Control of worker’s safety on site Project cost ...

Alternative route | Omegna (Verbania, Italy)

Regional Road n. 229 “Lago d’Orta”: completion of the alternative route in Omegna (Verbania, Italy) Customer ARES Piedmont – Regional Road Agency Activities Preliminary and Final Design Environmental studies Site Supervision, Quantity Survey Control of worker’s ...

National Road n.26 “della Val d’Aosta”

Modernization and safety improvement of National Road 26 “della Val d’Aosta”. Chivasso – Caluso section with bypass of Arè urban area (Turin, Italy) Customer A.N.A.S. – Compartimento di Torino –  (Italian Road Board – Turin ...

Waste Water Treatment | Chivasso (Turin)

Waste Water Treatment Plant: Upgrading to activated sludge system – 40.000 equivalent inhabitants. Chivasso (Turin, Italy) Customer SMAT S.p.A. (Turin Water Company) Activities Preliminary and Final Design Site Supervision, Quantity Survey Control of worker’s safety on site Project cost ...

Novara-Boschetto Intermodal Freight Terminal

Novara-Boschetto Intermodal Freight Terminal in Novara (Italy) Customer C.I.M. S.p.A. Activities Feasibility study and Environmental studies Masterplan and Preliminary Design Final Design of infrastructures (road network, water supply, sewerage, street lighting, etc.) Final Design of ...

“E. Agnelli” Hospital | Pinerolo (Turin, Italy)

“E. Agnelli” Hospital in Pinerolo (Turin, Italy): development and extension Customer A.S.L. n. 10 of Pinerolo Activities Preliminary and Final Design (Architecture, Structural and MEP Engineering) Site Supervision (MEP Engineering) Quantity Survey Project cost Euro ...