Infrastucture & Hydraulics

Water pipeline of the Lanzo Valleys | Turin (Italy)

General Water pipeline of the Lanzo Valleys: restoration works (reconstruction and extension) following the damages caused by the 1993 inundation. Turin (Italy) Customer Valli di Lanzo Mountain Communities Prestazioni svolte Preliminary and Final Design Site ...

Urbanization works in the industrial area | Borgovercelli (Vercelli, Italy)

Urbanization works in the industrial area of Borgovercelli (Vercelli, Italy) Customer Nordind S.p.A. Activities Preliminary Design (MEP Engineering, Roadways, Drainage and Sewer System) Site Supervision, Quantity Survey Control of worker’s safety on site Activities Euro 5,3 ...

Golf resort “Is Molas”: Tintioni stream | Pula (Cagliari, Italy)

Golf resort “Is Molas”: Risk analysis and hydraulic works of Tintioni stream in Pula (Cagliari, Italy) Customer Is Molas S.p.A. Activities Hydraulic and hydrological studies Environment (Environmental Impact Assessment) Provision of hazard and hydraulic risk ...

Tanaro and Bormida rivers | Alessandria (Italy)

Tanaro and Bormida Rivers: works for the riverbank defense Alessandria (Italy) Customer AIPO – Agenzia Interregionale per il fiume Po (Hydraulic authority for the River Po) Activities Final Design Site Supervision, Quantity Survey Project cost Euro 11.0 mln ...

Hydraulics intervention Pellice River | Garzigliana and Cavour (Turin, Italy)

Pellice River (within the municipalities of Garzigliana and Cavour): hydraulics intervention works. Turin (Italy) Customer AIPO – Agenzia Interregionale per il fiume Po (Hydraulic authority for the River Po) Activities Final Design Site Supervision, Quantity Survey ...

“Sponda Verde” residential buildings | Turin (Italy)

“Sponda Verde”: residential buildings, offices, mall, hotel and underground car-parks in former industrial area. Turin (Italy) Customer Private Investor Prestazioni svolte Concept Design Urban Planning Preliminary and Final Design (Architecture, Structural & MEP Engineering, Infrastructure) ...

Ex area industriale "Cogne" | Aosta

Transformation of the former Cogne industries area: construction of the infrastructures and reclamation of the land. Aosta (Italy) Committente Valle d’Aosta Struttura S.r.l. Activities Feasibility Study Preliminary and Final Design Site Supervision, Quantity Survey Project cost ...

Torino-Orbassano Intermodal Freight Terminal | Turin (Italy)

Torino-Orbassano Intermodal Freight Terminal. Turin (Italy) Customer S.I.TO. S.p.A. Prestazioni svolte Masterplan and Feasibility study General layout and urban planning of the whole intervention Preliminary and Final Design (Infrastructure, roads networks, Buildings, etc.) Project cost ...

Railway line Cagliari – Golfo Aranci

Doubling of the railway line Cagliari – Golfo Aranci in the section Decimomannu – San Gavino. (Cagliari, Italy) Customer Italferr S.p.A Activities Final Design (Structural Engineering, Hydraulics, Roadways and Railway works) Project cost Euro 57,4 ...

Waste Water Treatment Plant | Bolzano (Italy)

Reconstruction and modernization of the mud dehydration section at the Waste Water Treatment Plant of Bolzano (Italy) Customer ECO-CENTER S.p.A. Prestazioni svolte Preliminary and Final Design Project cost Euro 2,3 mln of works Years 1998 ...