Infrastucture & Hydraulics

Le Officine” multipurpose center | Savona (Italy)

Requalification of “Metalmetron” area. “Le Officine” multipurpose center with hotel, commercial and handcraft activities in Savona (Italy) Customer Private Investor Activities Preliminary and Final Design Control of worker’s safety on site Site Supervision Project cost ...

Ceronda River Hydraulic studies | Venaria Reale (Turin, Italy)

New parkings areas and link road in the historical complex of Royal Palace “Reggia di Venaria”: Hydraulic Studies of River Ceronda between the confluence with River Casternone and the one with River Stura di Lanzo. Venaria (Turin, Italy) Customer La Venaria Reale – Cultural ...

Riqualification of portual areas | Genova (Italy)

Requalification of portual areas from Bengasi quay to Inglese quay in Genoa (Italy) Customer Genoa Port Authority Activities Final Design (Architecture, Structural, Infrastructural and MEP Engineering) Project cost Euro 43,2 mln of works Years 2010 ...

Novara ring road | Italy

Completion of Novara ring road | Italy Customer A.N.A.S. S.p.A. (Italian Road Board) Activities Environment Preliminary and Final Design (Infrastructure and MEP Engineering) Project cost Euro 86,6 mln of works Years 2009 – 2011 with ...

Feasibility Study of Integrated Water System | Albania

Feasibility Study of Integrated Water System in Tirana, Durres, Valona and Patos (Albania) Customer IRIDE S.p.A. Activities Data Collection (Water Supply System, Sewerage and Waste Water Treatment Plant) Preliminary Analysis and Cost Estimation of necessary interventions ...

“Fieramilano” headquarters | Rho (Milan, Italy)

“Fieramilano” headquarters, in the Milan-Rho Fair Center | Milan (Italy) Customer Sviluppo Sistema Fiera S.p.A. (Milan Fair Co.) Activities International architecture & construction contest: winning proposal Project Management Environmental aspects Preliminary and Final Design (MEP ...

Refinery of Ballshi (Albania)

Waste Water Treatment Plant in the refinery of Ballshi (Albania) Customer IRIDE S.p.A. for the Ministry of Economy, Trade and Energy, represented by sh.a ARMO – Albania Activities Final Design Technical assistance during the construction ...

Regional Piedmont Government New Headquarters | Turin (Italy)

Regional Piedmont Government New Headquarters in Turin (Italy) Customer Piedmont Regional Administration Activities International architecture contest: winning proposal Masterplan and Urban planning Preliminary and Final Design (MEP & Structural Engineering, Environment, Infrastructure) Control of worker’s ...

Italian Air Force relocation | Caserta (Italy)

Italian Air Force relocation from the Caserta Royal Complex: universitary residence, auditorium and multipurpose center. Caserta (Italy) Customer Municipality of Caserta Activities Design and built competition: I° prize Preliminary and Final Design (Infrastructure and MEP ...

Waste Water Treatment Plant | Scafati (Napoli, Italy)

Waste Water Treatment Plant in Sant’Antonio Abate/Scafati (Naples, Italy) Customer Prefecture of Naples – Extraordinary Commissionership according to OPCM 14/04/95 Activities Final Design of the purifying plant and the surrounding infrastructure Project cost Euro 58,8 ...