Roadway & Transportation

“Framtek” conversion of former industrial area | Turin (Italy)

Transformation and conversion of the “Framtek“ industrial area into a residential buildings. Turin (Italy) Customer GEFIM Costruzioni S.p.A. Activites Preliminary and Final Design (architecture, structural and MEP Engineering, Infrastructure) Site Supervision, Quantity Survey Control of worker’s ...

Urbanization works in the industrial area | Borgovercelli (Vercelli, Italy)

Urbanization works in the industrial area of Borgovercelli (Vercelli, Italy) Customer Nordind S.p.A. Activities Preliminary Design (MEP Engineering, Roadways, Drainage and Sewer System) Site Supervision, Quantity Survey Control of worker’s safety on site Activities Euro 5,3 ...

Railway redoubling in the Palermo urban area | Palermo (Italy)

Railway redoubling in the Palermo urban area: sections Palermo Centrale – Notarbartolo, Notarbartolo – Isola di Femmine, Isola di Femmine – Carini. Palermo (Italy) Customer Italferr S.p.A. (Italian State Railway Engineering Co.) Activities Final Design ...

“Sponda Verde” residential buildings | Turin (Italy)

“Sponda Verde”: residential buildings, offices, mall, hotel and underground car-parks in former industrial area. Turin (Italy) Customer Private Investor Prestazioni svolte Concept Design Urban Planning Preliminary and Final Design (Architecture, Structural & MEP Engineering, Infrastructure) ...

Ex area industriale "Cogne" | Aosta

Transformation of the former Cogne industries area: construction of the infrastructures and reclamation of the land. Aosta (Italy) Committente Valle d’Aosta Struttura S.r.l. Activities Feasibility Study Preliminary and Final Design Site Supervision, Quantity Survey Project cost ...

Torino-Orbassano Intermodal Freight Terminal | Turin (Italy)

Torino-Orbassano Intermodal Freight Terminal. Turin (Italy) Customer S.I.TO. S.p.A. Prestazioni svolte Masterplan and Feasibility study General layout and urban planning of the whole intervention Preliminary and Final Design (Infrastructure, roads networks, Buildings, etc.) Project cost ...

Railway line Cagliari – Golfo Aranci

Doubling of the railway line Cagliari – Golfo Aranci in the section Decimomannu – San Gavino. (Cagliari, Italy) Customer Italferr S.p.A Activities Final Design (Structural Engineering, Hydraulics, Roadways and Railway works) Project cost Euro 57,4 ...

Turin-Ceres railway: Caselle underground passage | Turin (Italy)

Turin-Ceres railway: Caselle urban area underground passage with station. Turin (Italy) Customer S.A.T.T.I. S.p.A. Prestazioni svolte Preliminary and Final Design Environmental Studies Site Supervision, Quantity Survey Control of worker’s safety on site Project cost Euro 24,0 ...

Florence-Pisa railway line, Alternative route Signa-Montelupo

Civil works of the Arno viaduct. Alternative route of Signa-Montelupo on the Florence-Pisa railway line.  (Florence, Italy) Customer Italferr S.p.A Prestazioni svolte Preliminary and Final Design (Architecture, Geotechnical, Structural and MEP Engineering) Control of worker’s ...

New Turin-Lyon High Speed Railway Line. Carrière du Paradis

New Turin-Lyon High Speed Railway Line. Environmental analysis of marine storage at Carrière du Paradis, Mont Cenis pass (France) Customer Alpetunnel GEIE Prestazioni svolte Environmental analysis for the recovery of the abandoned quarry Mode and ...