Detailed design of the Drinking water treatment plant in the town of Bardonecchia, completion works; regulation equipment and SCADA of the new Susa Valley water supply system, which will distribute the water throughout the valley, with a total length of about 70km, bridging the water deficit of all the municipalities crossed.
Services provided
Detailed design with firm Degrémont
Subject contract: drinking water treatment plant (maximum capacity 500l/s); hydraulic modeling of the water main (lenght70km – diameter 700mm) and of the distribution network; selection of the most suitable hydraulic valves; detailed design of n.3 hydropower plants on the drinking water supply pipes (recovery of the excess head); automation and remote control (SCADA); detailed design of the sanification and commissioning of the WTP and the whole Susa Valley water supply system.
Project cost
Euro 20.2 mln of works
Years
2014