Acoustic testing has begun on the railway noise barriers installed in Area 3 in Genova, as part of the infrastructure upgrade of the Voltri/Brignole section.
The barriers undergoing this testing were already subject to acoustic analysis during the design phase: their effectiveness was assessed and documented in the Predictive Acoustic Impact Assessment, prepared as part of the final design.
News